Dredging of a raw water dam in a Blackwater based mine site


The Scope of works was to clean out a raw water dam that had become silted up over the years and could no longer hold sufficient water. Our IMS 5012 Dredge was selected to remove up to 1,800 m3 of solids from the dam on a daily basis.